    Electric Hook-Up Installation Guide for Site Owners

    Everything you need to know about installing and managing electric hook-ups.

    By Hamish Lowry-Martin

    Co-Founder, PayCamp

    January 19, 2026 · Updated June 15, 2026
    9 min read
    1

    Mastering Electric Hook-Ups for Your Site

    A comprehensive guide for campsite owners to install and manage efficient, compliant, and profitable electric hook-ups.

    2

    Complete Electric Hook-Up Installation Guide for Site Owners

    Installing or upgrading electric hook-ups is one of the most impactful improvements you can make to your site. This guide covers regulations, specifications, installation considerations, and cost recovery.

    💡

    Compliance is Key

    Adhering to BS 7671 (18th Ed.) is mandatory for safety and insurance.

    🔌

    Standard Sockets

    16A, 230V, BS EN 60309-2 "commando" type with IP44 rating.

    💰

    Cost Recovery

    Strategies like metered billing can provide a quick payback, often under 3 years.

    Future-Proofing

    Consider EV charging and higher amperage supplies for premium pitches.

    Regulatory Framework

    BS 7671 Wiring Regulations (18th Edition)

    The IET Wiring Regulations are the UK standard:

    1

    Specific Section

    Section 708 specifically covers caravan/camping parks.

    2

    Special Installations

    Part 7 addresses special installations requirements.

    3

    Insurance & Safety

    Compliance is mandatory for insurance and ensures primary safety.

    4

    Stay Updated

    Updates every 3-4 years (check current edition for latest requirements).

    Key Regulatory Requirements

    Requirement Specification Why It Matters
    RCD protection 30mA, 40ms trip time Life safety
    Maximum earth loop impedance Per circuit design Fault clearance
    Isolation switching Per pitch Maintenance safety
    Socket height 0.5-1.5m above ground Accessibility/safety
    Cable burial depth 500mm minimum Mechanical protection

    Pro Tip: Certified Installation

    Always use an NICEIC or NAPIT registered electrician who is familiar with Section 708 of BS 7671. Their expertise is invaluable and guarantees compliance.

    Socket Specification

    Standard Touring Pitch Socket

    Component Specification
    Socket type BS EN 60309-2 "commando"
    Current rating 16A (3.68kW capacity)
    Voltage 230V single phase
    Configuration Blue, 2P+E (3-pin)
    IP rating IP44 minimum (outdoor)
    RCD protection Integral or upstream

    Premium Pitch Options

    For super-pitches or permanent installations:

    Upgrade Specification Use Case
    32A supply 7.36kW capacity Large motorhomes, winter heating
    Metered supply Sub-metering per pitch Fair billing, energy monitoring
    Twin socket 2 x 16A Multi-unit pitches
    EV charging Type 2, 7-22kW Electric vehicle support

    Distribution System Design

    Supply Assessment

    Before installation, assess your incoming supply:

    • Current maximum demand
    • Diversity calculations for pitches
    • Future expansion allowance
    • DNO (Distribution Network Operator) capacity

    Typical Demand Calculations

    Installation Size Assumed Diversity Recommended Supply
    Up to 25 pitches 40% 100A 3-phase
    25-50 pitches 35% 200A 3-phase
    50-100 pitches 30% 400A 3-phase
    Over 100 pitches 25% Multiple supplies

    Distribution Architecture

    Incoming Supply

    Main Switchboard

    Sub-Distribution Boards (per area)

    Individual Pitch Supplies

    Installation Options

    Underground Cabling

    The preferred method for permanent installations:

    Aspect Specification
    Cable type SWA (Steel Wire Armoured)
    Burial depth 500mm (600mm under roads)
    Bedding 50mm sand below and above
    Marking tape Warning tape above cable
    Route marking Cable markers at key points

    Cost estimate: £40-80 per linear metre installed

    Surface-Mounted Systems

    For temporary or flexible installations:

    • Armoured cable on posts
    • Cable protection where crossing paths
    • Higher visibility but less aesthetic
    • Easier to modify/extend

    Cost estimate: £25-50 per linear metre installed

    Bollard and Post Options

    Installation Configurations

    Type Description Cost per Pitch
    Single socket bollard One 16A outlet £150-250
    Twin socket bollard Two 16A outlets £200-350
    Service bollard Electric + water + waste £400-700
    Metered bollard With sub-meter £250-400
    Premium pillar Multiple services, lighting £600-1,200

    Material Options

    Material Pros Cons Lifespan
    GRP (fibreglass) Lightweight, no corrosion UV degradation 15-20 years
    Stainless steel Durable, premium look Higher cost 25+ years
    Galvanised steel Cost-effective Can corrode 15-20 years
    Powder-coated steel Good appearance Chip damage 15-20 years

    Metering Considerations

    Why Sub-Meter?

    Billing Method Pros Cons
    Inclusive (flat rate) Simple admin Subsidises high users
    Metered (actual use) Fair, encourages conservation Admin complexity
    Hybrid Base rate + excess Balance of both

    Metering Technology

    System Type Cost per Pitch Features
    Manual read meters £30-60 Basic, staff reading required
    Prepayment meters £150-250 Guest self-service
    Smart meters £200-400 Remote reading, real-time data
    Cloud-connected £250-450 Full automation, analytics

    Did You Know?

    Implementing smart metering not only enables fair billing and cost recovery but also provides valuable data on energy usage patterns, helping you manage site demand more efficiently.

    EV Charging Integration

    Adding EV Capability

    Approach Description Cost Addition
    Shared charging points Central location £2,000-8,000 per charger
    Pitch-integrated 3kW Slow charge at pitch £100-200 per pitch
    Pitch-integrated 7kW Standard home charge rate £300-500 per pitch
    22kW fast chargers Dedicated EV bays £5,000-15,000 per unit

    Infrastructure Planning

    • Assess supply capacity for EV load
    • Consider diversity (not all charge simultaneously)
    • Plan cable routes for future expansion
    • Choose open-protocol chargers

    Project Planning

    Installation Timeline

    Phase Duration Activities
    Design 2-4 weeks Survey, specification, quotations
    DNO application 4-12 weeks If supply upgrade needed
    Groundworks 1-4 weeks Trenching, ducting, backfill
    Electrical first fix 1-2 weeks Cabling, distribution
    Bollard installation 1-2 weeks Mounting, connections
    Testing and commissioning 2-5 days Certification

    Contractor Selection

    Requirements for your electrical contractor:

    • NICEIC or NAPIT registered
    • Experience with caravan park installations
    • BS 7671 Section 708 knowledge
    • Appropriate insurance coverage
    • References from similar projects

    Cost Recovery

    Pricing Electric

    Approach Rate Example Recovery Method
    Pitch rate inclusive £0/kWh visible Built into pitch fee
    Metered at cost £0.28/kWh Actual cost pass-through
    Metered with margin £0.35-0.45/kWh Cost recovery + margin
    Flat daily rate £4-8/day Simple, guaranteed

    Payback Calculations

    50-pitch installation example:

    Item Cost
    Installation £35,000
    Annual revenue (metered at £0.35, avg 8kWh/day, 180 days) £25,200
    Annual electricity cost £12,600
    Net annual income £12,600
    Payback period 2.8 years

    Maintenance and Testing

    Periodic Inspection

    Test Type Frequency Performed By
    Visual inspection Monthly Site staff
    RCD function test 3-monthly Site staff
    Electrical inspection 12 months (public) Qualified electrician
    Full EICR 5 years Registered contractor

    Common Issues to Monitor

    • Socket damage from misuse
    • RCD nuisance tripping
    • Water ingress into enclosures
    • Cable damage from ground movement
    • Overloading (kettle + heater + AC)

    ---

    Ready to Upgrade Your Site?

    • Define your needs & budget.
    • Consult BS 7671 experts.
    • Plan for capacity & future growth (EVs!).
    • Implement smart metering for efficiency.
    • Ensure regular maintenance & inspections.

    **Monitor your electricity consumption, manage metered billing, and track infrastructure maintenance with PayCamp's integrated utility management**—from installation planning to daily operations.

    Reports — PayCampTry it

    Occupancy

    78%

    +4% vs last period

    Revenue

    £2,480

    +12% vs last period

    Outstanding

    £340

    -8% vs last period

    Daily Occupancy

    Mon
    Tue
    Wed
    Thu
    Fri
    Sat
    Sun

    Switch time periods above — stats and chart animate instantly

    Example: Business reporting in PayCamp
    electricity
    installation
    guide

    Found this helpful?

    Share it with fellow site operators

    See how PayCamp works

    See how PayCamp can help you manage bookings, compliance, and billing in one simple platform.

    Ready to See It in Action?

    Take the 2-minute guided tour or start your free 14-day trial — no credit card required.